Low ceilings, ductwork and beams in the way, moisture problems, adding egress windows or a bathroom below the sewer line: these are the basement projects many remodelers turn down. They are the ones we take on.
Morgan Remodel plans the space around how your family will actually use it, then handles framing, electrical, plumbing, drywall, flooring and finishes. Our free Basement Remodel Guide helps you decide what to include, and our basement remodel pricing page shows typical budgets.
We take on the hard projects. Working around beams, ducts and support posts, solving moisture problems before we finish a wall, adding egress windows and plumbing a basement bathroom are where our experience shows. We plan the hard parts first, so your finished basement feels like part of the house, not an afterthought.
A limited number of projects, so yours gets real attention. We take on a limited number of remodels at a time on purpose. Either Jon or Michael Morgan manages your project personally, and you will have a direct line to the person running it.
See your basement before we build it. On most projects we create a 3D design of your finished basement, so you can see the layout, bar, bathroom and finishes and make changes before construction starts.
No guesswork on cost or quality. We publish starting prices online, give you a detailed scope before work begins, and back our workmanship with a 5-year guarantee.
Clearing out old finishes or a partial build-out so your new space starts on a clean, solid base.
Finishing a basement, adding a bathroom or creating a bedroom usually requires a permit. We handle the permits and inspections, including egress requirements for bedrooms.
Below-grade floors need materials that handle moisture. Luxury vinyl plank is the most popular choice, with carpet, engineered flooring and tile also available.
Built-in shelving, bars, fireplace surrounds, staircase updates and new rooms like a bedroom, office or theater.
Recessed lighting, plenty of outlets, TV and speaker wiring for a theater, and power for a bar or workshop.
Adding a full or half bathroom, a wet bar, a kitchenette or a utility sink.
Framing new walls and rooms, then hanging and finishing drywall for clean walls and ceilings.
Walls, ceilings and trim painted to make a below-grade space feel bright and welcoming.
A new stair railing that makes the trip downstairs feel like part of the finished home.
Most basement remodels take 2–4 weeks once construction starts, depending on the scope of work. If your project needs a permit, add 3–4 weeks depending on your municipality.
Usually, yes. Finishing a basement, adding a bathroom or creating a bedroom typically requires a permit. We handle the paperwork and inspections, and we’ll make sure any bedroom has a code-compliant egress window.
We look for signs of water before we finish anything. Leaks or moisture problems need to be fixed first, and we choose flooring and materials that are suited to below-grade spaces.
In most homes, yes. The cost depends on where your existing plumbing is. If the new bathroom sits below your main sewer line, it may need a pump to carry waste up and out.
Usually. Because the foundation, walls and roof already exist, finishing a basement typically costs less per square foot than building an addition. See our basement remodel pricing page for typical ranges.
Often, yes. Low ceilings, moisture issues, egress windows and basement bathrooms are a big part of what we do. Tell us what you have been told, and we will give you an honest answer about what is possible.
Planning a remodel?
Free monthly tips, costs & project ideas.
Get free monthly tips: real cost guidance, before-and-after projects near you, and mistakes to avoid.
One email a month. Unsubscribe anytime.
MONTHLY REMODELING TIPS
Join Central Indiana homeowners who get our free newsletter, about once a month:
One email a month. No spam. Unsubscribe anytime.